The Project

RK&K supported the South Carolina Department of Transportation (SCDOT) in developing a corridor study focused on multimodal transportation needs along the SC 517 (Isle of Palms Connector) corridor, including the SC 517/SC 703 (Palm Boulevard) intersection. The study was initiated following public concern over a revised bridge lane configuration and sought to identify the most effective long-term transportation solution between the Town of Mount Pleasant and the Isle of Palms.

Originally constructed without dedicated bicycle or pedestrian facilities, the bridge included two travel lanes, a striped median, and shoulders serving as emergency lanes. A later pavement marking modification reconfigured the bridge from a three-lane cross section to a two-lane section that included dedicated bicycle and pedestrian accommodations. In response to public feedback regarding this change, SCDOT commissioned a comprehensive study to evaluate current and future multimodal transportation needs throughout the corridor.

RK&K assessed existing travel patterns, projected future traffic demands, and conducted operational and capacity analyses at key intersections and along the bridge corridor. The team developed and evaluated a range of alternatives designed to optimize the corridor for all users, including motorists, bicyclists, and pedestrians, while also exploring opportunities for new multimodal connections within the surrounding area.

Related Projects

See More Projects

You might also be interested in:

Ready to work with us? Let’s get started.