$0.5M
Project
Project Manager:

Lindsey Barnwell

The Project

RK&K is providing CEI services for this project converting the existing US 441 and SR 46 diamond interchange to an at-grade intersection with a three-span steel box girder flyover bridge. SR 46 (US 441) will be widened from two to six lanes. The high-profile, environmentally-sensitive project also includes milling, and resurfacing, subsoil excavation, MSE walls, drainage, sidewalk, curbing, signals, and ITS along with two new bridges. RK&K is responsible for supervising construction processes, supervising the quality management program, supervising contract progress and final pay processes, and negotiating, documenting and processing modifications to the contract, as well as recording contract in the project as-built drawings.