$0M
Project
Project Engineer:

Joshua Kahan

The Project

RK&K designed a 3-span, 470-ft long, 45-ft wide, $29M new bridge to provide a connection to planned development areas along the Christina River in Wilmington, DE.

The selected final design consists of a post-tensioned, spliced concrete bulb-T superstructure on driven pile foundations. Approach roadway embankments utilized EPS Styrofoam and Deep Soil Mixing to reduce loads and settlements on weak soils.

Completed in 2019, this project includes a pedestrian underpass to maintain connectivity of an existing Riverwalk pedestrian path. Aesthetic finishes, lighting and railings were an important element for the project in the thriving Riverfront area.

“Christina River Bridge is the first post-tensioned prestressed bulb-T bridge built in DE. It has been rewarding to provide an innovative design and to coordinate closely with the contractor to deliver a signature bridge for the downtown waterfront.”

Joshua Kahan, Project Engineer

Related Projects

You might also be interested in:

Ready to work with us? Let’s get started.