Design-Build

designBuildI-485/I-85 Interchange | Part of the Charlotte, NC Outer Loop

RK&K has significant experience delivering projects under the design-build method. Clients benefit from our in-house, engineering, and construction expertise and our processes for efficiently managing all aspects of a project—from programming, design, and pre-construction to construction and close-out. Our multi-disciplinary teams collaborate seamlessly to deliver the streamlined experience of a sole-source design and construction process that is unmatched in quality, service, speed, and accountability. RK&K has successfully executed some of the most complex transportation projects for Departments of Transportation throughout the mid-Atlantic and Southeast regions by teaming with local, regional, and nationally recognized transportation contractors.

Examples of Work

Arkendale-Powells Creek (Cherry Hill) Third Track King Street Improvements Route 29 Solutions
Asheboro Southern Bypass, US 64 West to US 64 East MD 32 Linden Church Road Interchange SR 739 over Branch Shohola Creek
Dover Transit Center MD 404 SR 896/Palmetto Expressway from Flagler Street to BW 154th Street
Frederick Douglass Bridge/S. Capitol Street Improvements Monroe Connector Bypass Triangle Parkway
I-485/I-85 Interchange/Part of the Charlotte Eastern Outer Loop NC 43 Connector US 13 Salisbury Bypass/11 Bridge Rehabilitation
Waterfront Bulkhead Repairs at Indian River US 220/NC 68 Connector (Future I-73) I-64 Widening & Route 623 Improvements
Joppatowne Wastewater Treatment Plant U/V Disinfection WV Route 2, Cresap to McKefrey